LIFT Intersects 11 m at 1.52% Li₂O at its Nite pegmatite, Yellowknife Lithium Project, NWT
YLP-0174 explored the Nite pegmatite approximately 100 m from its northern end and 50 m beneath the surface.
- YLP-0174 explored the Nite pegmatite approximately 100 m from its northern end and 50 m beneath the surface.
- Drilling intersected three pegmatite dykes ranging from 2-5 m wide for cumulative pegmatite of 9 m over 27 m of core.
- New drilling intersected a 16 m dyke preceded by four 1-7 m dykes for cumulative pegmatite of 31 m over 72 m of drill core.
- Figure 3 – Cross-section illustrating YLP-0177 with results as shown in the Nite pegmatite dyke with a 11 m interval of 1.52% Li2O.