GM200

United Lithium Intersects 1.45% Li2O over 29.5 m and 1.52% Li2O over 26 m at Kietyönmäki Project, Finland

Retrieved on: 
Thursday, October 19, 2023

This new drilling builds upon positive historical drill results from previous operators including:

Key Points: 
  • This new drilling builds upon positive historical drill results from previous operators including:
    1.10% Li2O over 42 m by previous operator Sunstone Metals Ltd. (“Sunstone”).
  • Drill hole ULDH-3 with pegmatite reporting 1.52% Li2O over 25.95 m from 33.70 m depth down hole.
  • Drill hole ULDH-4 with pegmatite reporting 1.45% Li2O over 29.50 m from 69.10 m depth down hole.
  • Some notable drilling results include 1.31% Li2O over 24.25 m from 58.75 m depth down hole (hole R310); 1.66% Li2O over 13 m from 86.00 m depth down hole (hole R316); and 1.53% Li2O over 23 m from 14.10 m depth down hole (hole R307).