126.3 m at 1.66% Li2O and 16.1 m at 5.02% Li2O in First Batch of 2024 Drill Results from CV5 at Corvette

70.1 m at 2.44% Li2O, including 46.9 m at 3.53% Li2O or 16.1 m at 5.02% Li2O (CV24-401A).