CV13

New High-Grade Zone Discovered at CV13 - 34.4 m at 2.90% Li2O, including 21.9 m at 3.58% Li2O, Corvette

Retrieved on: 
Tuesday, May 7, 2024

Mineralization at shallow depth (starting at ~125 m vertical depth from surface) with a near-horizontal orientation, and open in multiple directions.

Key Points: 
  • Mineralization at shallow depth (starting at ~125 m vertical depth from surface) with a near-horizontal orientation, and open in multiple directions.
  • Focus of 2024 winter drilling at CV13 was step-out holes in support of a maiden mineral resource estimate for the pegmatite.
  • Updated mineral resource estimate, scheduled for Q3 2024, will focus on upgrading the resource category at CV5 and include a maiden resource at CV13.
  • The Corvette Property (the "Property" or "Project"), wholly owned by the Company, is located in the Eeyou Istchee James Bay region of Quebec.

126.3 m at 1.66% Li2O and 16.1 m at 5.02% Li2O in First Batch of 2024 Drill Results from CV5 at Corvette

Retrieved on: 
Wednesday, May 1, 2024

70.1 m at 2.44% Li2O, including 46.9 m at 3.53% Li2O or 16.1 m at 5.02% Li2O (CV24-401A).

Key Points: 
  • 70.1 m at 2.44% Li2O, including 46.9 m at 3.53% Li2O or 16.1 m at 5.02% Li2O (CV24-401A).
  • Core assay results are reported herein for 34 drill holes completed at CV5 in 2024.
  • Drill results for 34 drill holes, completed during the recently completed 2024 winter drill program at the CV5 Spodumene Pegmatite, are reported herein (Figure 1).
  • 70.1 m at 2.44% Li2O, including 46.9 m at 3.53% Li2O or 16.1 m at 5.02% Li2O (CV24-401A).

Patriot Battery Metals to Present at OTCQX Best 50 Virtual Investor Conference April 18th

Retrieved on: 
Thursday, April 18, 2024

The Company today announced that Ken Brinsden, President and CEO, will present live at the OTCQX Best 50 Virtual Investor Conference hosted by VirtualInvestorConferences.com, on April 18th, 2024.

Key Points: 
  • The Company today announced that Ken Brinsden, President and CEO, will present live at the OTCQX Best 50 Virtual Investor Conference hosted by VirtualInvestorConferences.com, on April 18th, 2024.
  • This will be a live, interactive online event where investors are invited to ask the Company questions in real-time.
  • It is recommended that online investors pre-register and run the online system check to expedite participation and receive event updates.
  • The Company continues to intersect spodumenes at the CV13 pegmatite, as shown by drill results from summer-fall 2023 program.

Final 2023 Drill Hole Results for CV5 at Corvette including 133.9 m at 1.21% Li2O and Extending Strike to 4.6 km

Retrieved on: 
Sunday, April 21, 2024

133.9 m at 1.21% Li2O, including 41.5 m at 1.52% Li2O; and 42.2 m at 1.59% Li2O, including 10.1 m at 3.22% Li2O (CV23-298).

Key Points: 
  • 133.9 m at 1.21% Li2O, including 41.5 m at 1.52% Li2O; and 42.2 m at 1.59% Li2O, including 10.1 m at 3.22% Li2O (CV23-298).
  • 50.5 m at 1.42% Li2O, including 11.4 m at 3.13% Li2O; and 38.7 m at 2.06% Li2O, including 15.6 m at 3.26% Li2O (CV23-285).
  • 30.5 m at 0.77% Li2O, including 14.2 m at 1.57% Li2O; and 21.0 m at 0.81% Li2O, including 11.0 m at 1.46% Li2O (CV23-283) – collared in pegmatite.
  • 21.3 m at 0.88% Li2O, including 6.4 m at 1.87% Li2O; and 24.9 m at 0.83% Li2O, including 11.1 m at 1.80% Li2O (CV23-295).

Patriot Announces Final 2023 Drill Hole Results for the CV13 and CV9 Pegmatites, Corvette, Quebec, Canada

Retrieved on: 
Sunday, April 7, 2024

Core assay results are reported herein for all 18 drill holes completed in 2023 at the CV9 Spodumene Pegmatite.

Key Points: 
  • Core assay results are reported herein for all 18 drill holes completed in 2023 at the CV9 Spodumene Pegmatite.
  • Drill results for the remaining 20 drill holes completed in 2023 at the CV13 Spodumene Pegmatite are reported herein (Figure 1).
  • The most eastern drill hole (CV23-365) completed in 2023 at CV13, also the final hole of the 2023 drill program, returned 19.7 m at 0.43% Li2O, including 6.3 m at 1.22% Li2O.
  • Drill results for all 18 drill holes completed in 2023 at the CV9 Spodumene Pegmatite are reported herein (Figure 6).

Patriot Discovers New Spodumene-Pegmatite Occurrence (CV14) at Corvette, Quebec, Canada

Retrieved on: 
Monday, March 25, 2024

Data will help constrain the geological model for CV13 ahead of a maiden mineral resource estimate scheduled for Q3 2024.

Key Points: 
  • Data will help constrain the geological model for CV13 ahead of a maiden mineral resource estimate scheduled for Q3 2024.
  • Coupled with the numerous spodumene pegmatite boulders discovered over the Property, there remains strong potential for additional discoveries at Corvette."
  • Patriot Battery Metals Inc. (the "Company" or "Patriot") (TSX: PMET) (ASX: PMT) (OTCQX: PMETF) (FSE: R9GA) is pleased to announce results from its 2023 surface exploration campaign at the Corvette Property.
  • Collectively, CV14 forms part of an approximate 3.6 km long prospective spodumene pegmatite trend extending through CV10, and to the CV9 Spodumene Pegmatite.

Patriot Discovers New Spodumene-Pegmatite Occurrence (CV14) at Corvette, Quebec, Canada

Retrieved on: 
Sunday, March 24, 2024

Data will help constrain the geological model for CV13 ahead of a maiden mineral resource estimate scheduled for Q3 2024.

Key Points: 
  • Data will help constrain the geological model for CV13 ahead of a maiden mineral resource estimate scheduled for Q3 2024.
  • Coupled with the numerous spodumene pegmatite boulders discovered over the Property, there remains strong potential for additional discoveries at Corvette."
  • Patriot Battery Metals Inc. (the "Company" or "Patriot") (TSX: PMET) (ASX: PMT) (OTCQX: PMETF) (FSE: R9GA) is pleased to announce results from its 2023 surface exploration campaign at the Corvette Property.
  • Collectively, CV14 forms part of an approximate 3.6 km long prospective spodumene pegmatite trend extending through CV10, and to the CV9 Spodumene Pegmatite.

Patriot Announces Additional 2023 Drill Results at CV13 and Provides Infrastructure Development Update, Corvette, Quebec, Canada

Retrieved on: 
Sunday, February 25, 2024

Two (2) drill rigs are currently active at the CV13 Pegmatite as part of the ongoing 2024 winter drill program.

Key Points: 
  • Two (2) drill rigs are currently active at the CV13 Pegmatite as part of the ongoing 2024 winter drill program.
  • The Company is mobilizing an additional drill rig as part of the winter drill program, which will focus on geomechanical holes at CV5.
  • Drill results for 15 drill holes completed in 2023 at the CV13 Spodumene Pegmatite are reported herein (Figure 1).
  • Results for six (6) drill holes completed in 2023 along the eastern limb of CV13 remain to be reported (Figure 1).

Patriot Extends Strike of the CV5 Pegmatite, Drills 34.2 m at 1.06% Li2O in Step-Out Hole and 11.6 m at 3.25% Li2O in Infill Hole, Quebec, Canada

Retrieved on: 
Tuesday, February 6, 2024

Approximately 3 km of highly prospective geological trend remains to be drill tested between the CV5 and CV13 pegmatites.

Key Points: 
  • Approximately 3 km of highly prospective geological trend remains to be drill tested between the CV5 and CV13 pegmatites.
  • 89.5 m at 1.01% Li2O, 17.9 m at 1.31% Li2O, and 19.0 m at 2.56% Li2O, including 11.6 m at 3.25% Li2O (CV23-246).
  • Assays are reported herein for 12 drill holes completed in 2023 at the CV5 Spodumene Pegmatite.
  • Drill results for 12 drill holes completed in 2023 at the CV5 Spodumene Pegmatite are reported herein (Figure 1).

Patriot Drills 26.1 m at 1.21% Li2O in Step-Out Hole at the CV13 Pegmatite, Quebec, Canada

Retrieved on: 
Wednesday, January 31, 2024

15.7 m at 1.52% Li2O, including 10.6 m at 1.99% Li2O or 2.5 m at 5.28% Li2O (CV23-271).

Key Points: 
  • 15.7 m at 1.52% Li2O, including 10.6 m at 1.99% Li2O or 2.5 m at 5.28% Li2O (CV23-271).
  • Assays are reported herein for 22 drill holes completed in 2023 at the CV13 Spodumene Pegmatite.
  • Drill hole CV23-271 returned 10.6 m at 1.99% Li2O or 2.5 m at 5.28% Li2O within a wider interval of 15.7 m at 1.52% Li2O.
  • Results of previously reported drill holes from this zone include 12.7 m at 2.46% Li2O (CV23-191), 8.0 m at 2.86% Li2O (CV23‑195), 10.2 m at 2.70% Li2O (CV23-198), 10.7 m at 2.79% Li2O (CV23‑200), 14.0 m at 2.14% Li2O (CV22‑092), and 7.0 m at 1.98% Li2O (CV22-095).