126.3 m at 1.66% Li2O and 16.1 m at 5.02% Li2O in First Batch of 2024 Drill Results from CV5 at Corvette
70.1 m at 2.44% Li2O, including 46.9 m at 3.53% Li2O or 16.1 m at 5.02% Li2O (CV24-401A).
- 70.1 m at 2.44% Li2O, including 46.9 m at 3.53% Li2O or 16.1 m at 5.02% Li2O (CV24-401A).
- Core assay results are reported herein for 34 drill holes completed at CV5 in 2024.
- Drill results for 34 drill holes, completed during the recently completed 2024 winter drill program at the CV5 Spodumene Pegmatite, are reported herein (Figure 1).
- 70.1 m at 2.44% Li2O, including 46.9 m at 3.53% Li2O or 16.1 m at 5.02% Li2O (CV24-401A).